         1.  Pavement Assessment and Management Plan – The approximate cost is $150,000, and was awarded to the firm IMS Infrastructure Management.

 

        2.  Neighborhood Concrete Repair Projects

1. Broadway/Monroe - The approximate cost is $428,071, and was awarded to 71 Construction.

2. Rendezvous School Area – The approximate cost is $347,580, and was awarded to Triple A Building Services.

 

         3.  Asphalt Preservation Projects:

1. North Broadway Level Course and Chip Seal – The engineer’s estimate for this work is $160,000, and will be bid out in the near future.

2. Game Preserve Subdivision Chip Seal – The engineer’s estimate for this work is $150,000, and will be bid out in the near future.


Combined Asphalt and Concrete Preservation Projects:

1. North 1st Street Edge Mill and Overlay with Concrete Repair –The engineer’s estimate for this work is $172,100, and was awarded to Dave’s Asphalt.

2. North 16th East Street Edge Mill and Overlay with Concrete Repair – The engineer’s estimate for this work is $413,280, and was awarded to Dave’s Asphalt.

 

ADA Accessibility Project:

1. East Pershing ADA Ramp Installation – The engineer’s estimate for this work is $33,305, and was awarded to Ellis Concrete.